Posted date: Wed, 20th Aug
Location: Middle East / West Asia
2G/3G Commissioners ( LR 13.3G / LR 13.3W)
Commissioning and Integration of Alcatel PDH radio
Alcatel 3G migration from ATM to IP
MPR9500
Trouble-shooting of microwave equipment
Must Have : - Laptop with proper SWs, - GPS with UAE map to be able to reach the sites,
Mobile phone & UAE SIM card (preferably Etisalat SIM),
Data package for mobiles/laptops, to be able to access the internet/emails remotely & communicate easily with all project parties,
Know how to drive & have driving license,
Ready to check, from time to time, the sites installation quality & report snags/issues that could affect the site acceptance/operation & welling to guide, when necessary, the subcons on needed guidelines for acceptable installation procedure/quality.
Commissioning and Integration of Alcatel PDH radio
Alcatel 3G migration from ATM to IP
MPR9500
Trouble-shooting of microwave equipment
Must Have : - Laptop with proper SWs, - GPS with UAE map to be able to reach the sites,
Mobile phone & UAE SIM card (preferably Etisalat SIM),
Data package for mobiles/laptops, to be able to access the internet/emails remotely & communicate easily with all project parties,
Know how to drive & have driving license,
Ready to check, from time to time, the sites installation quality & report snags/issues that could affect the site acceptance/operation & welling to guide, when necessary, the subcons on needed guidelines for acceptable installation procedure/quality.
| Job Title | 2g/3g Commissioners |
| Post Details | |
| Posted By | Said Amma |
| Start Date | ASAP |
| Salary | |
| Email Address | samma@firstpointgroup.com |
| Category | |
| Job Type | Contract |
| Location | Middle East / West Asia |
| City or State | Dubai |
No comments:
Post a Comment